-- card: 115224 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Entering Dates -- part 1 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 2 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=58 right=272 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=58 right=216 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part contents for background part 31 ----- text ----- Setting Up a Project -- part contents for background part 32 ----- text ----- Entering Dates -- part contents for card part 2 ----- text ----- MacProject II needs at least one date from you to be able to calculate a schedule that is accurate for your project. This date should be a start date or a deadline date. You’ll also want to enter other dates that must be met within the project schedule. For most projects, you probably need to set only one fixed date. MacProject II calculates the rest of the dates based on the task and resource durations and the network of dependencies you specify. -- part contents for card part 3 ----- text ----- If you do not set the Earliest Start date for the beginning milestone on the Schedule Chart, MacProject II uses the first working day of the Project Calendar to begin its calculation. Important: Because the dates you set override any dates MacProject II calculates, you should set as few dates as possible. Dates you set are underlined in the Schedule Chart, Project Table, and Task Info window. -- part contents for card part 1 ----- text ----- 1 of 2